Skip to main content
Since 1977

200 kVA Generator

Equal to 160 kW. Cummins, Deutz, Perkins & Baudouin engines, open and silent, with fuel use and dimensions compared.

View Catalogue
Overview

Getting to Know 200 kVA Generators

A 200 kVA generator is about 160 kW at a power factor of 0.8. This mid class serves office buildings, hotels, small hospitals and small factories.

Engine choice in the 200 kVA class is the widest, so you can weigh fuel use, dimensions and service availability at your site.

Suited to

  • Office buildings
  • Hotels
  • Small hospitals
  • Small factories
  • Retail & supermarkets
  • Construction projects

Prime or Standby?

Main power

200 kVA prime

6models
  • The generator is the main power source, for example at a site without grid power
  • It runs long hours every day with a varying load

e.g. BJPS-200-WP

Grid backup

200 kVA standby

4models
  • The generator only runs during grid outages
  • Prime slightly below 200 kVA, standby around 200 kVA: usually more economical

e.g. CJPS C-180 WP

Model

200 kVA Generator Options

Every JERBINDO 200 kVA model by engine brand. Select a model for full specifications.

Cummins engine

Fuel at 75% (prime): 36–38 L/hr4 models
ModelPrime kVAStandby kVA
CJPS C-200 WP6CTAA8.3-G2200 kVA prime200220
CJPS O-200 WPQSB7G5200 kVA prime200220
CJPS C-180 WP6CTA8.3-G2200 kVA standby180198
CJPS O-181 WPQSB7-G4200 kVA standby181199.1
Cummins Generator

Deutz engine

Fuel at 75% (prime): 34.2–48.1 L/hr3 models
ModelPrime kVAStandby kVA
DJPS-200 WPBF6M 1013 FC200 kVA prime200220
DJPS-200 WP EDTTCD 2013 L06 4 V DCR200 kVA prime200220
DJPS-180 WPBF 6M 1013 FC200 kVA standby180198
Deutz Generator

Perkins engine

Fuel at 75% (prime): 34.7 L/hr2 models
ModelPrime kVAStandby kVA
PJPS-200 WP1106A-70TAG4200 kVA prime200220
PJPS-180 WP1106A-70TAG3200 kVA standby180198
Perkins Generator

Baudouin engine

Fuel at 75% (prime): 32 L/hr1 models
ModelPrime kVAStandby kVA
BJPS-200-WP6M16G220/5200 kVA prime200275
Baudouin Generator
Installation

Generator Room Requirements

General guidance for the 200 kVA class from engine and generator makers' installation manuals. Final figures follow the installation drawings and datasheet of the chosen unit.

Minimum room, 1 unit
5.9 × 4.2 m
Open type (L × W × H)
2500–2850 × 1000–1200 × 1500–1710 mm
Silent canopy (L × W × H)
3600–4000 × 1400 × 2030–2400 mm

Service clearance

1.5 m per side

  • Leave at least about 1.5 m of clear space on every side of the generator for maintenance (Cummins' guide for units from 100 kVA; other sources give 0.9–1.2 m), plus room above it to open panels. With the largest open unit in this class, one generator needs a room of at least about 5.9 × 4.2 m.

Ventilation

Outlet ≈ 1.5× radiator

  • Provide an air inlet behind the generator and an outlet in front of the radiator. As a general guide, the outlet is about 1.5× the radiator core area and the inlet 1.5–2× (louvres cut the free area by about 25%). Keep the room no more than about 7–10 °C above outdoor air; above 40 °C the generator needs derating.
  • In this class the radiator fan is usually enough, as long as the openings are not blocked.

Foundation

≥ 2× unit weight

  • A concrete foundation of at least about 2× the generator's weight, extending 150–300 mm beyond the skid on every side, with vibration isolators between the skid and the foundation. Let the concrete cure for 28 days before loading. Dry weight of the open units in this class: 1.1–2.4 tonnes.

Day tank

260–380 L / 8 hours

  • Fuel use at 75% load: 32–48.1 L/hr, or about 260–380 L for 8 hours of running. Size the day tank from this; for longer running add a bulk tank with a transfer pump.
  • NFPA 37 limits a tank inside the generator room to 2,500 L unless it has its own fire-rated room; local regulations also apply.

Exhaust

Backpressure ≤ datasheet

  • A flexible connector at the engine outlet; pipework supported on its own so it does not load the engine, insulated and fitted with a rain cap. Choose the pipe and silencer so backpressure stays within the engine datasheet limit; avoid long runs and many bends. Discharge away from the air inlet.

Configuration

Open · Silent · Mobile

  • Open units for a generator room; silent canopy units for outdoors.
  • An ATS/AMF panel for grid backup. For a growing load, two units can be synchronized in parallel.
Projects

Generator Projects Around 200 kVA

Projects from our project list with units of around 200 kVA.

More project references, 2021–2026

20 projects with units of around 200 kVA in our 2021–2026 project list. Client names are not shown.

  • Perkins 200 kVA

    School

    Tangerang, Banten · 2026

  • Baudouin 200 kVA

    Mining & smelter

    Samarinda, East Kalimantan · 2026

  • Deutz 200 kVA

    Water supply & pumping station

    Jember, East Java · 2025

  • Baudouin 2 × 200 kVA

    Office building

    Jakarta · 2025

  • Deutz 200 kVA

    Hospital

    Probolinggo, East Java · 2025

  • Baudouin 200 kVA

    Transport & port

    North Jakarta, Jakarta · 2025

  • Baudouin 200 kVA

    Aquaculture

    West Nusa Tenggara · 2024

  • Baudouin 200 kVA

    Retail & commercial

    Surabaya, East Java · 2023

FAQ

Frequently Asked Questions

How much does a 200 kVA generator cost?

The price of a 200 kVA generator depends on the engine brand, the configuration (open type, silent canopy, silent mobile), an ATS/AMF or synchronizing panel, installation and commissioning, the delivery location, and the warranty and after-sales service. Use Request a Quote with your requirements and our sales team will send a quotation. What shapes a generator price

How many kW is a 200 kVA generator?

At the 0.8 power factor commonly used for generators, 200 kVA equals 160 kW. The exact kW of each model is on its specification page.

How much diesel does a 200 kVA generator use?

At 75% load, the 200 kVA prime generators in our catalogue use about 32–48.1 L/hr, depending on the engine brand and model. Fuel use at 50% and 100% load is on each model's page.

Should I choose 200 kVA prime or standby?

Choose a 200 kVA prime model if the generator is the main power source or runs long hours with a varying load. If you need 200 kVA only as backup during grid outages, a model with a 200 kVA standby rating (and a slightly lower prime rating) is usually enough and more economical.

Conductorjasa industrial generator distribution for power projects across Indonesia
By the Numbers

Trusted by Various Companies

Decades of experience and a portfolio of projects across many sectors reflect our commitment to quality.

Our clients

  • Otsuka
  • BCA
  • Santos Jaya Abadi
  • Bank Indonesia
  • Telkom Indonesia
  • Adhi Karya
  • IKEA
  • JW Marriott
  • Spazio
  • Universitas Brawijaya
  • PUPR
  • Siloam Hospitals
  • Djarum
  • Avian Brands
  • PLN
  • Waskita
  • KAI
  • Ciputra World
  • Hero
  • Golden Palace Hotel
  • Institut Teknologi Bandung
  • Universitas Negeri Surabaya
  • Pemerintah Kota Mataram
  • Kievit
  • Gudang Garam
  • Polygon
  • Pertamina Geothermal Energy
  • WIKA
  • INKA
  • Giant
  • Ibis Hotel
  • Universitas Gadjah Mada
  • Universitas Ciputra
  • Pemerintah Kota Surabaya
  • Huawei
  • MNC
  • Kapal Api
  • PGN
  • PP Properti
  • Bulog
  • Transmart
  • Vasa Hotel
  • Westown View
  • Universitas Airlangga
  • Kementerian Sosial
  • National Hospital
Conductorjasa generator assembly workshop in Surabaya
Need a generator for your business?

Find the Right Industrial Generator Solution

Discuss your power requirements with our sales and service team to get the right products and services.

1977
Experienced since
ISO
9001 · 14001 · 45001
TKDN
Certified products
2
Offices & workshops

Tell Us What You Need

Provide the following information so our team can respond with a solution suited to your requirements.